BackDemo · synthetic data

Cascade Freight Networks8 months · Jan 2026 – Aug 2026

Freight Operations

Jan 2026 – Aug 2026latest Aug 2026synced Sep 1

3 of 12 off track.

1 to watch · 3 on track · 5 tracked, no goal

1 of 12 to watch.

3 off track · 3 on track · 5 tracked, no goal

3 of 12 on track.

3 off track · 1 to watch · 5 tracked, no goal

5 of 12 no goal.

3 off track · 1 to watch · 3 on track

Working well: Damage ratedown 17.8% — 3 periods in a row

On-time delivery

month trend

On-time delivery rose to 93.4% (+2.8 pts) compared with the same months a year earlier (Jan 2025 – Aug 2025) — a favourable move against the agreed definition.

Cost by lane

Top 5
  • Expedited$4.72
  • Last Mile$4.11
  • Cold Chain$3.20
  • Regional LTL$2.77
  • Long-haul FTL$2.51

Claim rate by lane

Top 5
  • Cold Chain1.81%
  • Expedited0.93%
  • Long-haul FTL0.60%
  • Regional LTL0.59%
  • Last Mile0.58%

Demonstration data. The figures are synthetic and contain no shipment-level customer information, but every calculation, comparison and goal works exactly as it does on a connected sheet.